
Marine Works
Marine Construction on the Gold Coast
Seawalls, revetments, boat ramps, pontoons and jetty works built from our 12-metre barge. Waterfront construction on Gold Coast canals, rivers and broadwater frontages.
Free quote
Tell us about your site
Send the basics and we will come back with a free, obligation-free quote — usually the same business day.
Your Marine Experts
On Demand Barges is your trusted partner for marine construction across the Gold Coast, Sunshine Coast, Brisbane, Northern NSW, regional QLD, and beyond. We specialise in building and installing durable water-based structures for residential, commercial, and industrial projects — including jetties, pontoons, wharves, boat ramps, and seawalls.
Our experienced team handles every stage of the build, from site preparation and foundation work through to final construction and finishing. Whether you're upgrading marine access or developing new waterfront infrastructure, we deliver practical, compliant solutions that are built to last in tough coastal environments.
Call us today on 0494 195 211 to get your marine construction project underway.
Why Choose Us?
- Extensive experience building durable marine infrastructure for varied environments.
- Full-service delivery from site preparation through to final installation.
- Projects are managed with precision to reduce delays and disruptions.
- All works meet current marine safety and regulatory standards.
- We tailor each build to site-specific conditions and long-term use.
Beenleigh Aquatic Centre
Mechanical demolition of 35m outdoor pool including building and structures Carried out the site remediation of contaminated material of approx. 900T. Removal of all demolition material including loading, transport and unloading of materials to a licensed off-site facility
Asbestos Removal & Demolition – Gray St, West Tweed
We safely removed bonded asbestos from dwellings, followed by the mechanical demolition of the old sewerage treatment plant, including inlet channels, balance tank, and pump station. All demolition material was managed responsibly, with loading, transport, and unloading carried out to a licensed off-site facility.
Isabel, 96 The Esplanade Burleigh Heads
Remove bonded asbestos from 3 storey apartment complexes. Mechanical demolition of both buildings using excavators with hydraulic attachments. Install piling platform for inground piling works Removal of all demolition material including loading, transport and unloading of materials to a licensed off-site facility
Common questions
What materials are used to build pontoons and jetties?
Timber, steel and composite decking are all common choices, often used together across one structure, with the right combination depending on exposure to saltwater, expected loads and how the structure will be used.
Why is groundwork important before building a marine structure?
Soft or uneven ground along the foreshore can undermine a structure if we do not prepare it properly first, and compaction and stable foundations help the finished build handle tides and everyday use.
How does tidal movement affect the construction of a new structure?
Work areas can flood or become inaccessible at different points in the tide cycle, so we stage construction around these windows to keep the build progressing safely.
Locations We Service
Planning a new pontoon, jetty or seawall? Call 0414 347 606.
Free quotes on every service, across the Gold Coast, Sunshine Coast, Brisbane, Northern NSW and regional QLD.
